Planned Major Works

Major Works

The Council recently announced £20 million of major works for the World's End Estate. The proposed major works include passenger lift replacement in all towers and estate-wide communal redecoration.

At the time of writing, this is the complete list of planned major works provided to the World's End Residents Association by Council staff:

Lifts
  • New passenger lifts to all towers (2 lifts in each tower, 14 lifts in total).
  • New goods lift.

It is expected that the cost of these works will be recharged to the estate's leaseholders.

Roofs
  • New roofs for all walkways (Dartrey Walk, Berenger Walk, Blantyre Walk, Whistler Walk).
  • New roofs for Ashburnham Tower, Berenger Tower and Blantyre Tower.
  • Roof repairs to Chelsea Reach Tower, Dartrey Tower, Greaves Tower and Whistler Tower as required.

It is expected that the cost of these works will be recharged to the estate's leaseholders.

Communal redecorations and repairs
  • Communal redecorations (i.e. redecorate all painted/decorated surfaces in communal areas).
  • Replacement/repair of expansion joints.
  • Masonry and concrete repairs where required.
  • Non-slip floor coatings to all tower stairwells (?).
  • Replacement of tower stairwell windows below 5th floor (?).

It is expected that the cost of these works will be recharged to the estate's leaseholders.

Communal and Emergency Lighting
  • Works to existing communal and emergency lighting so as to comply with BS5266-1.

It is expected that the cost of these works will be recharged to the estate's leaseholders.

Windows
  • Window servicing/overhauls where required (?).

It is unclear whether the volume of window servicing/overhaul required requires these works being major works or whether they could be dealt with as ordinary repairs. Either way the cost would be recharged to the estate's leaseholders.

In Council tenanted homes only:
  • New kitchens and bathrooms.
  • New smoke and heat detectors.

As these works are to Council tenanted homes only, their cost would not be recharged to the estate's leaseholders.

Budget

The Council has said that it has set aside £20 million for all of the above major works, and that the cost of the lift replacement works is currently estimated at £3.8 million.

Communal Heating and Hot Water System replacement

In addition, the Council is also proposing the wholesale replacement of the estate’s existing communal heating and hot water system. The cost of doing so is not included in the £20 million figure quoted above. The cost of replacing the estate's communal heating and hot water system is likely to exceed £20 million in its own right and would be recharged to the estate's leaseholders.

Related Articles:

Urgent lift works to start very soon

Council plans to proceed with works during lockdown

Communal Fire Doors to be replaced

Latest update on works

Digital TV Public Meeting

Home Page List All Articles